Ask why a build ran over budget and you will usually hear that materials became expensive. Look closely at the records and a different story appears: the estimate was never complete. Items that were always going to be needed simply were not written down.

This checklist is organised by stage. Quantities depend on your drawings, your soil and your specification, so treat it as a list of things to price rather than a bill of quantities.

Substructure

  • Setting-out pegs, lines and profile boards

  • Hardcore or laterite fill, and sand blinding

  • Cement, sharp sand and granite for foundation concrete

  • Reinforcement to the bar schedule, plus binding wire and spacer blocks

  • Damp-proof membrane and damp-proof course

  • Anti-termite treatment

  • Blocks for foundation walling up to DPC

Superstructure

  • Sandcrete blocks — confirm whether 6-inch or 9-inch, and for which walls

  • Mortar sand and cement

  • Reinforcement for columns, lintels and beams

  • Formwork: planks, props, plywood, nails — and allow for reuse losses

  • Concrete for columns, lintels and any suspended elements

Roofing

  • Wall plate, rafters, purlins and noggins

  • Roofing sheets or tiles, with ridge caps and valley pieces

  • Fasteners appropriate to the covering

  • Fascia, soffit and ceiling noggins

  • Gutters and downpipes

Services first fix

This is the stage most often missing from early estimates, because it disappears into the walls before anyone photographs it.

  • Conduit, back boxes, cabling and the distribution board

  • Pressure pipework, waste pipework, fittings and inspection chambers

  • Water storage tank and its support

Finishes

  • Plaster and screed: cement and plaster sand

  • Floor and wall tiles, adhesive and grout — add a cutting and breakage allowance

  • Doors, frames, windows and ironmongery

  • Primer, filler and paint for internal and external surfaces

  • Sanitary ware, taps and connections

  • Light fittings, switches and sockets

Three things to add to any estimate

First, a wastage allowance. Blocks break, tiles are cut, and mortar is dropped. Second, transport and offloading, which are rarely trivial and almost never included in a quoted material price. Third, storage and security, because materials that arrive too early tend to spoil, walk, or both.

A contingency is not padding. It is the acknowledgement that no drawing survives first contact with a site.

Prices move, and any figure quoted in an article like this would be wrong before you read it. Price the list against current supplier quotes, and re-price the long-lead items before you commit to a programme.